Lombardi Switzerland
Projects, News and More
Raising the intake structure at the Gigerwald reservoir
Engineering expertise under time pressure and alpine conditions
An Organizational Structure that further boosts Collaboration and Expertise
November 11, 2025In recent years, our projects, teams and responsibilities have expanded – along with the demands for collaboration, knowledge and accountability. To meet these needs, we have strengthened and refined our organization to ensure it is fully aligned with our strategic direction.
Refurbishment of the 1’900 m section including the Casermetta Tunnel
Safe passage through the Gondo Gorge
Zimmerberg-Base Tunnel 2: Design contract awarded
January 13, 2025As part of an engineering joint venture, we are pleased to have been awarded the contract for the 10.8-kilometer-long Zimmerberg Base Tunnel 2. The two single-truck tunnel tubes connect Thalwil and Zug and relieve the heavily used route.
Leysin365 : New rout Leysin-Village – Leysin-Télécabine
December 20, 2024We are proud to announce that we have been awarded the contract for the project lot 2: Civil engineering works for the new route Leysin-Village – Leysin-Télécabine of the Aigle-Leysin line of the Transports Publics du Chablais.