Cumbidanovu Dam
A pillar for the sustainability of the irrigation of Sardinia



«The heart of an irrigation project for Orgosolo, Oliena, Nuoro, Dorgali, Orune and Lula. Our engineering at the service of a sustainable agricultural future.»
The Cumbidanovu Dam, located in Orgosolo, Oliena, Nuoro, Dorgali, Orune and Lula in Sardinia, represents a tangible commitment to a sustainable agricultural future in this beautiful Italian region.
The dam is of the massive concrete gravity type, with a 330-meter curvilinear axis, divided into 19 segments, each with a width of 14 meters. The height of the dam reaches 67.17 meters, while the crowning development is 263.50 meters. This work will have a reservoir capacity of about 12.1 million cubic meters and a concrete volume of about 290,000 cubic meters.
The dam is equipped with a surface spillway with a maximum flow rate of 1,237 cubic meters/s, divided into two sectors, with a total net spillway length of 90 meters. In addition, there are bottom and depletion spillways, housed in metal pipes embedded in the structure, with maximum flow rates of 185 cu m/s and 34 cu m/s, respectively.
Construction of the Cumbidanovu Dam began several years ago. However, a devastating flood in November 2013 caused extensive damage to the areas dedicated to the facilities and halted the work. At the time of the flood event, all the excavation and reprofiling of the reservoir banks, as well as the casting of the dam segments totaling 43,000 cubic meters of concrete, corresponding to about 15 percent of the total volume of the work, had been carried out.
Lombardi Ingegneria has been contracted to complete this project. Our mission is to complete the dam and related ancillary works.
During the course of the project, final design work for integrated contract, safety coordination during the design phase, and on-site assistance to the injection test field on the existing dam segments, as well as large-scale shear tests on large concrete blocks, have been carried out.
In the near future, the Cumbidanovu Dam will be ready to play its role in promoting a more prosperous and sustainable Sardinia. Working together, we can achieve great change and contribute to a better future for this beautiful region.
- Hydroelectric power plants
- Dams and retention structures
- Irrigation schemes
- Advanced numerical modelling
- Dam safety assessment
- Environmental Impact Analyses
millions of cubic metres of water tanked
metres as dam height
millions of Euros, amount of the works
year of commencement of work
Lat: 40.215232
Lng: 9.366178
Orgosolo (Nuoro), Sardinia