Insights

Brenner Base Tunnel - Construction Lot H52 Hochstegen

Injection works in the Hochstegen tunnel zone

Injection works in the Hochstegen tunnel zone

In the Hochstegen tunnel zone, increased risk from ingress of groundwater was expected. Injection works were therefore carried out in the exploratory tunnel and in the main tunnel.

Published by
Markus Scheuringer edited
  • Dipl.-Ing. Dipl.-Wirt.Ing. Markus Scheuringer
  • Standortleiter Innsbruck
  • Contact
Published on
    November 09, 2023
Competences
  • Conventional and TBM tunnelling
  • Cavern and shaft construction
  • Tunnel safety